· Zero tailing tube cutting machine adopt zero waste chuck design scheme, save the waste of pipe;
· Top-mounted warehouse,50% floor area saved;
· Two station automatic feeding at the same time,Auto-adjusting four-jaw roller chuck;
· Efficiency increased by 81% ,The floor area is reduced by 23%;
· Automatic tube loading mecheanism, Two stations can be independently and automatically loading tube;
. Automatic tube clamping and centering no need to manually adjust the clamping position;
. Automatic and convenient material receiving design;
. One-person operate multi- machine.
Model | Pipe diameter range | Tube length | Positioning accuracy | Maximum accelerated | Maximum speed | Laser power | Overall dimension | Weight(kg) | Working environment |
PCH60012-T-A
|
Φ10-Φ80mm
(other size customized) |
6000mm | ±0.03mm/m | 1.2G | 120rpm/min | 1000-3000W | 11350 × 3500 ×
2450mm |
6500 | Temp: 0~45℃
Humidity:≤80% Clean |
1.Integrates 2 tube cutting system in 1 body, both head could work seperately, very compact design also enjoy double productivity;
2.Adopt unique upper automatic feeding structure of machine, reduce the occupation of space, save more than 1/3 of space than peers on average;
3.Equipped with pneumatic self-centering chuck, “zero waste” processing, save the material;
4.Support offset tube center error in production to improve through holes cutting precision. Besides standard tube like square and round tube, TubePro also supports profiles and free form tube production of U/L/H/T channels, Obroud, oval and polygon etc;
Machine tool: large gantry milling, 600℃ heat treatment, 24 hours cooling inside the furnace to ensure the steel welded joint stress relief, then guarantee the machine tool long term accuracy and stability.